RCPS with Variable Intensity Activities and Feeding Precedence Constraints
Author:
- 10 December 2006
- book chapter
- Published by Springer Nature
- p. 105-129
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Project Scheduling Approach to Production PlanningCIRP Annals, 2003
- A review of the contribution of Operational Research to Project ManagementEuropean Journal of Operational Research, 2002
- Practical problem solving with cutting plane algorithms in combinatorial optimization1995
- Optimization of a 532-city symmetric traveling salesman problem by branch and cutOperations Research Letters, 1987
- Valid Linear Inequalities for Fixed Charge ProblemsOperations Research, 1985
- Multiple resource leveling in construction systems through variation of activity intensitiesNaval Research Logistics Quarterly, 1983
- Project Scheduling with Continuously-Divisible, Doubly Constrained ResourcesManagement Science, 1981
- Project Scheduling with Discrete and Continuous ResourcesIEEE Transactions on Systems, Man, and Cybernetics, 1979
- Time-Optimal Control of Resource Allocation in a Complex of Operations FrameworkIEEE Transactions on Systems, Man, and Cybernetics, 1976
- Maximal Flow Through a NetworkCanadian Journal of Mathematics, 1956