Mathematical model for vehicle scheduling
Open Access
- 1 January 2023
- conference paper
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2707 (1)
Abstract
In the cloud computing environment most noteworthy problem is task scheduling to augment the concert and effectiveness of cloud it is an important move. Informed search algorithms in Artificial intelligence are applied to execute the arrangement in cloud. The Best First Search (BFS) is used to allocate the job to Practical Machine (PM) and Virtual Vehicle (VV). In the BFS the best one as first priority assortment of job is used which may relegate the concert of cloud for minimization of Operational Completion Time (OCT). The best job selection is enhanced with job assortment, PM selection and VV algorithms. The performance of BFS compared with other task scheduling algorithms.Keywords
This publication has 42 references indexed in Scilit:
- Machines and AGVs Scheduling in Flexible Manufacturing System With Mean Tardiness CriterionInternational Journal of Advanced Materials Manufacturing and Characterization, 2014
- A hybrid particle swarm optimization approach for the sequential ordering problemComputers & Operations Research, 2011
- Alleviating the Collision States and Fleet Optimization by Introducing a New Generation of Automated Guided Vehicle SystemsModelling and Simulation in Engineering, 2011
- The integrated yard truck and yard crane scheduling problem: Benders’ decomposition-based methodsTransportation Research Part E: Logistics and Transportation Review, 2010
- A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehiclesInternational Journal of Production Research, 2008
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminalEuropean Journal of Operational Research, 2007
- A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehiclesInternational Journal of Production Research, 2004
- Complexity of the AGV shortest path and single-loop guide path layout problemsInternational Journal of Production Research, 1997
- A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMSOperations Research, 1995
- A note on two problems in connexion with graphsNumerische Mathematik, 1959