The (s, Q) inventory model with Erlang lead time and deterministic demand
- 2 July 2004
- journal article
- research article
- Published by Wiley in Naval Research Logistics (NRL)
- Vol. 51 (6) , 906-923
Abstract
We develop a simple, approximately optimal solution to a model with Erlang lead time and deterministic demand. The method is robust to misspecification of the lead time and has good accuracy. We compare our approximate solution to the optimal for the case where we have prior information on the lead‐time distribution, and another where we have no information, except for computer‐generated sample data. It turns out that our solution is as easy as the EOQ's, with an accuracy rate of 99.41% when prior information on the lead‐time distribution is available and 97.54–99.09% when only computer‐generated sample information is available. Apart from supplying the inventory practitioner with an easy heuristic, we gain insights into the efficacy of stochastic lead time models and how these could be used to find the cost and a near‐optimal policy for the general model, where both demand rate and lead time are stochastic. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004Keywords
This publication has 15 references indexed in Scilit:
- An Inventory Model with Order CrossoverOperations Research, 1998
- New Bounds and Heuristics for (Q, r) PoliciesManagement Science, 1998
- Using the Deterministic EOQ Formula in Stochastic Inventory ControlManagement Science, 1996
- An (s,q) inventory model with stochastic and interrelated lead timesNaval Research Logistics (NRL), 1995
- Lead-time variability reduction in stochastic inventory modelsEuropean Journal of Operational Research, 1992
- Setup cost reduction in an inventory model with finite-range stochastic lead timesInternational Journal of Production Research, 1990
- A Revision of the Power Approximation for Computing (s, S) PoliciesManagement Science, 1984
- The Power Approximation for Computing (s, S) Inventory PoliciesManagement Science, 1979
- Technical Note—The EOQ Model under Stochastic Lead TimeOperations Research, 1979
- Inventory Control with Normal Demand and Gamma Lead TimesJournal of the Operational Research Society, 1972