Multi-objective biased randomised iterated greedy for robust permutation flow shop scheduling problem under disturbances
- 12 July 2019
- journal article
- research article
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 71 (11) , 1847-1859
Abstract
Nowadays, scheduling problems under different disruptions are a key to become competitive in the global market of this century. Permutation flow shop scheduling problems are very important as they consider one of the important types of scheduling problems. In this paper, we consider a challenging scheduling problem of a permutation flow shop in the presence of different types of real-time events such as new job arrival and machine breakdown. A multi-objective optimisation model that takes into account multiple performance measures in order to minimise the effect of different real-time events is used in this paper. To solve this problem, we apply the proposed multi-objective model and adapt a predictive-reactive based Biased Randomised Iterated Greedy approach for the problem, which is hybridised a Biased Randomisation process and the Iterated Greedy algorithm. Furthermore, the proposed approach is compared against the predictive-reactive based Particle Swarm Optimisation method for the same problem. Additionally, to show the efficiency of the proposed model, we compare this model by testing the predictive-reactive based BRIG approach to two other models: the bi-objective model that consider only two objectives and the classical single-objective model of minimising the makespan. Further statistical analysis is performed in this study by using an Analysis of Variance measure. The extensive experiments and statistical analysis demonstrate that the proposed multi-objective model is better than the other models in reducing the relative percentage deviation. Additionally, despite their simplicity, the BRIG algorithm is shown to be state-of-the-art method that outperforms the Particle Swarm Optimisation algorithm.Keywords
This publication has 32 references indexed in Scilit:
- Flow shop rescheduling under different types of disruptionInternational Journal of Production Research, 2013
- A practical weight sensitivity algorithm for goal and multiple objective programmingEuropean Journal of Operational Research, 2011
- Theory and Applications of Robust OptimizationSIAM Review, 2011
- An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectivesEuropean Journal of Operational Research, 2008
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problemEuropean Journal of Operational Research, 2007
- Executing production schedules in the face of uncertainties: A review and some future directionsEuropean Journal of Operational Research, 2005
- Using real time information for effective dynamic schedulingEuropean Journal of Operational Research, 2002
- Benchmarks for basic scheduling problemsEuropean Journal of Operational Research, 1993
- Simulated annealing for permutation flow-shop schedulingOmega, 1989
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983