Experience and Development in Non-destructive D-C Testing for Maintenance of High-Voltage Stators [includes discussion]
Authors:
- 1 January 1956
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems
- Vol. 75 (3) , 201-210
Abstract
By the previously published technique1 of measuring insulation resistance at increasing direct voltages, the serviceability of the major stator insulation of 25 high-voltage rotating machines of various sizes, types, and ages has been appraised for maintenance purposes. In some cases, adverse conditions have been detected, always nondestructively. So far there has been no service failure of insulation shown by the test to have adequate strength. Thanks to the collaboration of several utilities, further information has been obtained from tests on condemned windings. Developments described relate to reduction of testing time, and improvement of instru-mentation, technique, and interpretation. Conditions favorable and unfavorable to reliable measurements are exemplified. The significance of electric strength as a criterion of serviceability is discussed.Keywords
This publication has 3 references indexed in Scilit:
- Testing of Main Turbine-Generator Insulation [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1956
- An examination of high-voltage d.c. testing applied to large stator windingsProceedings of the IEE - Part A: Power Engineering, 1955
- Diagnoses of A-C Generator Insulation Condition by Nondestructive Tests [includes discussion]Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1952