Pile foundation of high-speed railway undergoing repeated groundwater reductions
Authors:
- 16 April 2021
- journal article
- research article
- Published by Zhejiang University Press in Journal of Zhejiang University-SCIENCE A
- Vol. 22 (4) , 277-295
Abstract
Long-pile groups of railway foundation undergo excessive settlements after groundwater reductions, which may exceed the settlement limit and threaten the sKeywords
Funding Information
- the Basic Science Center Program for Multiphase Evolution in Hypergravity at the National Natural Science Foundation of China (51988101)
- the Chinese Program of Introducing Talents of Discipline to University (B18047)
- the Key Research and Development Program of Zhejiang Province, China (2019C03111)
This publication has 43 references indexed in Scilit:
- Stiffness and strength parameters for hardening soil model of soft and stiff Bangkok claysSoils and Foundations, 2012
- Integrating finite element and load-transfer analyses in modelling the effects of dewatering on pile settlement behaviourCanadian Geotechnical Journal, 2012
- Analytical and 3D numerical modelling of full-height bridge abutments constructed on pile foundations through soft soilsComputers and Geotechnics, 2011
- Centrifuge and numerical modeling of axial load effects on piles in consolidating groundCanadian Geotechnical Journal, 2009
- A practical design approach for piles with negative frictionProceedings of the Institution of Civil Engineers - Geotechnical Engineering, 2008
- Results from long-term measurement in piles of drag load and downdragCanadian Geotechnical Journal, 2006
- Time-dependent behavior of pile groups by staged construction of an adjacent embankment on soft clayCanadian Geotechnical Journal, 2004
- Numerical modelling of group effects on the distribution of dragloads in pile foundationsGéotechnique, 2002
- Centrifuge Modelling of Pile Groups Adjacent to Surcharge LoadsSoils and Foundations, 1997
- Analysis of downdrag on pile groupsGéotechnique, 1995