An Agent-Based Approach for Scheduling Multiple Machines
Authors:
- 1 March 2001
- journal article
- Published by Springer Nature in Applied Intelligence
- Vol. 14 (2) , 135-144
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Scheduling jobs on parallel machines with sequence-dependent setup timesEuropean Journal of Operational Research, 1997
- Evaluation of leading heuristics for the single machine tardiness problemEuropean Journal of Operational Research, 1997
- A heuristic to minimize the total weighted tardiness with sequence-dependent setupsIIE Transactions, 1997
- SoftwarePhysics World, 1996
- A heuristic for the single machine tardiness problemEuropean Journal of Operational Research, 1993
- Heuristics for minimizing mean tardiness form parallel machinesNaval Research Logistics (NRL), 1991
- An Integrated Framework for Generating and Revising Factory SchedulesJournal of the Operational Research Society, 1990
- A survey of algorithms for the single machine total weighted tardiness scheduling problemDiscrete Applied Mathematics, 1990
- An Improved Algorithm for Scheduling Jobs on Identical MachinesA I I E Transactions, 1977
- Complexity of Machine Scheduling Problems1977