Estimated Splash and Training Wall Height Requirements for Stepped Chutes Applied to Embankment Dams
- 1 November 2017
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydraulic Engineering
- Vol. 143 (11)
Abstract
Aging embankment dams are commonly plagued with insufficient spillway capacity. To provide increased spillway capacity, stepped chutes are frequently applied as an overtopping protection system for embankment dams. Stepped chutes with sufficient length develop aerated flow. The aeration and flow turbulence can create a significant amount of splash over the stepped chute training wall if not appropriately accounted for in the design. Recommendations for stepped chute training wall height requirements are available in the literature with little to no supporting data available. Researchers at the USDA-Agricultural Research Service (ARS) Hydraulic Engineering Research Unit (HERU) in Stillwater, Oklahoma, conducted a series of tests in a near prototype scale stepped chute facility to quantify the maximum splash height, , expected from aerated flow and to provide design recommendations for training wall height necessary to minimize erosive splash over the wall. Data indicate the maximum ranged between 1.1 and 3.7 times the critical flow depth ( ) and between 2.3 and 5.5 times the bulked flow depth ( ). For , the minimum training wall height required above the step edge downstream of the free-surface inception point, , is . For , normalized by follows a simple power function of . According to the data, an increase of to approximately may be needed. These minimum training wall height requirements are recommended for use in skimming flow conditions (i.e., ) for nonconverging stepped chutes with slopes ranging 10–30°.
Keywords
This publication has 10 references indexed in Scilit:
- Roller compacted concrete and stepped spillways: From new dams to dam rehabilitation2017
- Simplistic Design Methods for Moderate-Sloped Stepped ChutesJournal of Hydraulic Engineering, 2014
- Aeration and air–water mass transfer on stepped chutes with embankment dam slopesEnvironmental Fluid Mechanics, 2014
- Inception Point for Embankment Dam Stepped SpillwaysJournal of Hydraulic Engineering, 2013
- Scale effects in physical hydraulic engineering models By VALENTIN HELLER, Journal of Hydraulic Research, Vol. 49, No. 3 (2011), pp. 293–306Journal of Hydraulic Research, 2012
- Self-entrainment of air on stepped spillwaysInternational Journal of Multiphase Flow, 2011
- Flow Characteristics of Skimming Flows in Stepped ChannelsJournal of Hydraulic Engineering, 2004
- Two-Phase Flow Characteristics of Stepped SpillwaysJournal of Hydraulic Engineering, 2003
- Experimental investigations of air entrainment in transition and skimming flows down a stepped chuteCanadian Journal of Civil Engineering, 2002
- Hydraulics of skimming flows over stepped channels and spillwaysJournal of Hydraulic Research, 1994