Ensuring the Reliability of Gas Supply Systems by Optimizing the Overhaul Planning
Authors:
- Volodymyr GrudzVGVolodymyr Grudz
- Yaroslav GrudzYGYaroslav Grudz
- Ivan PavlenkoIvan Pavlenko
- Oleksandr LiaposhchenkoOleksandr Liaposhchenko
- Marek OchowiakMarek Ochowiak
- Vasyl PidluskiyVPVasyl Pidluskiy
- Oleksandr PortechynOPOleksandr Portechyn
- Mykola IakymivMykola Iakymiv
- Sylwia WłodarczakSylwia Włodarczak
- Andżelika KrupińskaAKAndżelika Krupińska
- Magdalena MatuszakMMMagdalena Matuszak
- Krystian CzernekKrystian Czernek
Open Access
Abstract
The aim of the article is the development of methods for optimal overhaul planning of compressor station equipment. Nowadays, due to uncertainties in the forecast of gas supply flow rates, increasing the reliability and energy efficiency of main gas pipelines is an urgent problem. The dependence of operating costs for major repairs on the maintenance periodicity is extreme. Reducing equipment’s maintenance period leads to an increase in repair costs. It also increases the reliability of equipment operation. Overall, all these facts reduce the probability of emergency failures and related expenses for emergency recovery, gas losses, and undersupply to consumers. Therefore, an optimal maintenance frequency exists, at which the total operating costs will be minimal. A procedure for optimizing the periodicity of repairs and equipment replacement is proposed. It was realized by constructing an objective function as a dependence of exploitation costs on the inter-repair period of major repairs. A probabilistic approach was applied to assess the aging process. The characteristics of the equipment’s state are described by distribution densities (i.e., pre-repair, inter-repair, and full-service life), which vary depending on product initialization time. The main characteristics of major repairs are their duration and intensity, which are evaluated by the quality factor related to repair costs. The extremum of the objective function is sought by the method of competing options. It was determined that the optimal management of the frequency of equipment replacement can be realized by choosing the optimal values of the average service life, average operation time of units until the first planned and preventive repair, and quality factor. As a result, the required technical condition for the technological equipment is ensured under minimum operating costs without reducing the system’s reliability.Keywords
Funding Information
- Ulam NAWA Programme (BPN/ULM/2022/1/00042)
This publication has 27 references indexed in Scilit:
- Manufacturing process data analysis pipelines: a requirements analysis and surveyJournal of Big Data, 2019
- Handbook of Natural Gas Transmission and Processing2019
- A new model for the optimization of periodic inspection intervals with failure interaction: A case study for a turbine rotorCase Studies in Engineering Failure Analysis, 2017
- Reliability, Availability, Maintainability (RAM) study, on reciprocating compressors API 618Petroleum, 2017
- Development of a slender continuum robotic system for on-wing inspection/repair of gas turbine enginesRobotics and Computer-Integrated Manufacturing, 2017
- A Study of the Unsafe Actions of Staff in the Maintenance and Overhaul Unit at a Petrochemical Complex and the Presentation of Control StrategiesBiotechnology and Health Sciences, 2016
- A multi-objective mixed integer nonlinear programming model for construction site layout planning to minimise noise pollution and transport costsAutomation in Construction, 2016
- Modes of functioning of the automated system “pipeline” with integrated logistical support of pipelines and vessels of industrial enterprisesJournal of Machinery Manufacture and Reliability, 2015
- Economic life assessment of power transformers using an improved modelCSEE Journal of Power and Energy Systems, 2015
- Design and control of pig operations through pipelinesJournal of Petroleum Science and Engineering, 2008