A credibility-constrained programming for reliable forward–reverse logistics network design under uncertainty and facility disruptions
- 7 April 2014
- journal article
- research article
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 28 (6) , 664-678
Abstract
This paper offers a credibility-constrained programming model for reliable design of an integrated forward–reverse logistics network with hybrid facilities under uncertainty and random facility disruptions. To tackle with this problem, a novel mathematical model is first developed that integrates the network design decisions in both forward and reverse flows and utilises reliability concepts to deal with facility disruptions. Then, the developed model is enhanced based on the credibility-constrained programing to cope with the epistemic uncertainties embedded in the model parameters. Since the hybrid distribution-collection facilities play an important role in both forward and reverse flows, it is supposed that they might be randomly disrupted. Several effective reliability strategies are considered to hedge against random facility disruptions. First, locating two types of hybrid facilities, namely, reliable and unreliable, is taken into account in the concerned logistics network when disruptions strike. Second, unreliable hybrid facilities are allowed to be partially disrupted, and thus a percentage of their capacities may be lost. However, they can still serve their customers with their remaining capacities. To compensate the lost capacity at unreliable hybrid facilities, a sharing strategy is also considered, in which goods can be shipped from reliable hybrid facilities to unreliable ones. Finally, several numerical experiments along with a sensitivity analysis are conducted to illustrate the significance and applicability of the developed model as well as the effectiveness of the credibility-based solution approach.Keywords
This publication has 55 references indexed in Scilit:
- Strategies for protecting supply chain networks against facility and transportation disruptions: an improved Benders decomposition approachAnnals of Operations Research, 2012
- A possibilistic linear programming model for supply chain network design under uncertaintyIMA Journal of Management Mathematics, 2012
- A closed-loop supply chain network design problem with integrated forward and reverse channel decisionsIIE Transactions, 2010
- Reliable Facility Location Design Under the Risk of DisruptionsOperations Research, 2010
- Quantitative models for inventory and production planning in closed-loop supply chainsInternational Journal of Production Research, 2010
- Stochastic multi-objective production-distribution network design using simulation-based optimizationInternational Journal of Production Research, 2008
- Fuzzy multi-objective optimization for network design of integrated e-supply chainsInternational Journal of Computer Integrated Manufacturing, 2007
- Facility Reliability Issues in Network p-Median Problems: Strategic Centralization and Co-Location EffectsOperations Research, 2007
- The importance of decoupling recurrent and disruption risks in a supply chainNaval Research Logistics (NRL), 2007
- Heuristic Solution Methods for Two Location Problems with Unreliable FacilitiesJournal of the Operational Research Society, 1987