Profit analysis of a warm standby non-identical unit system with single server performing in normal/abnormal environment
- 21 June 2019
- journal article
- research article
- Published by Springer Nature in Life Cycle Reliability and Safety Engineering
- Vol. 8 (3) , 219-226
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- Profit analysis of a two-unit cold standby system model operating under different weather conditionsLife Cycle Reliability and Safety Engineering, 2018
- Stochastic analysis of two-unit redundant system with priority to inspection over repairLife Cycle Reliability and Safety Engineering, 2018
- Stochastic analysis of a two-unit system with standby and server failure subject to inspectionLife Cycle Reliability and Safety Engineering, 2017
- RELIABILITY MEASURES OF A COLD STANDBY SYSTEM WITH PREVENTIVE MAINTENANCE AND REPAIRInternational Journal of Reliability, Quality and Safety Engineering, 2013
- Analysis of a two-unit warm standby system subject to degradationMicroelectronics Reliability, 1997
- A maintenance model for two-unit redundant systemMicroelectronics Reliability, 1997
- Profit analysis of a system with two-units having guarantee periods and delayed operation of standbyMicroelectronics Reliability, 1994
- Reliability and availability analysis of a system with warm standby and common cause failuresMicroelectronics Reliability, 1993
- Cost-benefit analysis of a one-server two-unit cold standby system with repair and preventive maintenanceMicroelectronics Reliability, 1985
- Stochastic behaviour of a two-unit priority standby redundant system with repairMicroelectronics Reliability, 1975