Flow-Shop Scheduling Problem Applied to the Planning of Repair and Maintenance of Electromedical Equipment in the Hospital Industry
Open Access
- 12 December 2022
- Vol. 10 (12) , 2679
Abstract
In the literature, several approaches have been proposed to integrate and optimize product supply and construction processes associated with demand management. However, in Industry 4.0, there needs to be more studies related to applying techniques that directly affect the programming and reprogramming process that integrates the industries at the operational level. This document proposes a flow-shop scheduling procedure to address the problem of planning the repair of medical equipment in public hospitals whose main objective is to eliminate downtime and minimize total production time. The research stems from the practical problem of responding to clinical users who make use of critical equipment, such as mechanical respirators, due to COVID-19, and the limited quantity of this equipment, which makes it necessary to have repair planning processes that seek to keep the equipment in operation for the most extended amount of time. The novelty of this study is that it was applied to a critical and real problem in the industry with a high economic and social impact, which has not been explored previously. The results show improvements in the overall planning and execution of electro-medical equipment repair. Several improvements to the applied methods were identified as future work, such as the need to consider work interruptions and psychosocial effects on workers due to the stricter planning of execution times.Keywords
Funding Information
- Escuela de Comercio of the Pontificia Universidad Católica de Valparaíso
This publication has 68 references indexed in Scilit:
- Programación de Máquinas Paralelas no Relacionadas con Tiempos de Montaje dependientes de la Secuencia y Entrada Dinámica usando Algoritmos GenéticosInformación tecnológica, 2013
- A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion timeComputers & Operations Research, 2006
- A review of exact solution methods for the non-preemptive multiprocessor flowshop problemEuropean Journal of Operational Research, 2005
- Flowshop-scheduling problems with makespan criterion: a reviewInternational Journal of Production Research, 2005
- Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors — a case studyInternational Journal of Production Research, 2004
- A case study in a two-stage hybrid flow shop with setup time and dedicated machinesInternational Journal of Production Economics, 2003
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- Scheduled inspection of electromedical equipment. Planning and assessmentJournal of Medical Engineering & Technology, 1995
- Simulated annealing for permutation flow-shop schedulingOmega, 1989
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983