Robotic tower cranes with hardware-in-the-loop: Enhancing construction safety and efficiency
Authors:
- Teerapat Kian Xiong KuTKTeerapat Kian Xiong Ku
- Bingran ZuoBZBingran Zuo
- Wei Tech AngWAWei Tech Ang
- 12 September 2024
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 168
Abstract
No abstract availableKeywords
Funding Information
- Singapore Housing and Development Board
- Government of Singapore Building and Construction Authority
This publication has 14 references indexed in Scilit:
- Technologies, levels and directions of crane-lift automation in constructionAutomation in Construction, 2023
- Crane-lift path planning for high-rise modular integrated construction through metaheuristic optimization and virtual prototypingAutomation in Construction, 2022
- Nonlinear Anti-swing Control of Underactuated Tower Crane Based on Improved Energy FunctionInternational Journal of Control, Automation, and Systems, 2021
- Lift planning and optimization in construction: A thirty-year reviewAutomation in Construction, 2020
- Minimum-time S-curve commands for vibration-free transportation of an overhead crane with actuator limitsControl Engineering Practice, 2020
- Automatic re-planning of lifting paths for robotized tower cranes in dynamic BIM environmentsAutomation in Construction, 2020
- Smart work packaging-enabled constraint-free path re-planning for tower crane in prefabricated products assembly processAdvanced Engineering Informatics, 2020
- Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiencyAdvanced Engineering Informatics, 2012
- A laser-technology-based lifting-path tracking system for a robotic tower craneAutomation in Construction, 2009
- Automation of existing tower cranes: economic and technological feasibilityAutomation in Construction, 1998