New Method for Prediction of Loads in Steel Reinforced Soil Walls
- 1 November 2004
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Geotechnical and Geoenvironmental Engineering
- Vol. 130 (11) , 1109-1120
Abstract
The paper describes a new working stress design methodology introduced by the writers for geosynthetic reinforced soil walls (K-Stiffness Method) that is now extended to steel reinforced soil walls. A large database of full-scale steel reinforced soil walls (a total of 20 fully instrumented wall sections) was used to develop the new design methodology. The effects of global wall stiffness, soil strength, reinforcement layer spacing, and wall height were investigated. Results of simple statistical analyses using the ratio of measured to predicted peak reinforcement loads (i.e., method bias) demonstrate the improved prediction accuracy. The AASHTO Simplified Method results in an average method bias of 1.1 with a coefficient of variation (COV) of 45%, whereas the proposed K-Stiffness Method results in an average bias of 0.95 and a COV of 32%. Soil strength was found to have limited influence on reinforcement loads for steel reinforced soil walls, especially for high shear strength soils, while global wall st...Keywords
This publication has 14 references indexed in Scilit:
- A new working stress method for prediction of reinforcement loads in geosynthetic wallsCanadian Geotechnical Journal, 2003
- Soil Reinforcement Loads in Geosynthetic Walls at Working Stress ConditionsGeosynthetics International, 2002
- Global Level of Safety and Performance of Geosynthetic Walls: An Historical PerspectiveGeosynthetics International, 2002
- Limit Equilibrium as Basis for Design of Geosynthetic Reinforced SlopesJournal of Geotechnical and Geoenvironmental Engineering, 1998
- Performance of Geosynthetic Reinforced Slopes at FailureJournal of Geotechnical and Geoenvironmental Engineering, 1998
- Working Stress Design Method for Reinforced Soil WallsJournal of Geotechnical Engineering, 1994
- REINFORCED EARTH WALL ON THE M25 MOTORWAY AT WALTHAM CROSS.Proceedings of the Institution of Civil Engineers, 1990
- Direct shear tests on reinforced sandGéotechnique, 1987
- REINFORCED EARTH RETAINING WALL AT A3/A322 INTERCHANGE: DESIGN, CONSTR UCTION AND COST.Proceedings of the Institution of Civil Engineers, 1986
- The strength and dilatancy of sandsGéotechnique, 1986