An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
Authors:
- 1 October 2011
- journal article
- research article
- Published by Elsevier in Information Sciences
- Vol. 181 (20) , 4804-4822
Abstract
No abstract availableKeywords
This publication has 24 references indexed in Scilit:
- Differential evolution for solving multi-mode resource-constrained project scheduling problemsComputers & Operations Research, 2009
- A hybrid multi-objective shuffled frog-leaping algorithm for a mixed-model assembly line sequencing problemComputers & Industrial Engineering, 2007
- Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithmSoft Computing, 2007
- Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimizationEngineering Optimization, 2006
- Multimode Project Scheduling Based on Particle Swarm OptimizationComputer-Aided Civil and Infrastructure Engineering, 2006
- Comparison among five evolutionary-based optimization algorithmsAdvanced Engineering Informatics, 2005
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithmsJournal of the Operational Research Society, 2003
- Local search for nonpreemptive multi-mode resource-constrained project schedulingIIE Transactions, 1997
- PSPLIB - A project scheduling problem libraryEuropean Journal of Operational Research, 1997
- Strength and adaptability of problem-space based neighborhoods for resource-constrained schedulingOR Spectrum, 1995