Integration of Wind and Hydropower Systems: Results of IEA Wind Task 24
- 1 February 2012
- journal article
- Published by SAGE Publications in Wind Engineering
- Vol. 36 (1) , 1-17
Abstract
In May of 2004, the IEA Wind Implementing Agreement (IA) established R&D Task 24, “Integration of Wind and Hydropower Systems.” Australia, Canada, Finland, Norway, Sweden, Switzerland, and the United States joined Task 24 with the goal of collaborating in the study of wind integration in a variety of electrical system configurations (load, generation, and transmission); hydro system configurations and characteristics; and market and operational configurations. Representing these countries were utilities and research organizations with the intent to understand the potential for and limiting factors in integrating wind into systems with hydropower. Case studies that analyze the feasibility, benefits, detriments, and costs of specific wind-hydro integration projects were the mechanism through which the goals of the task were addressed. The purpose of this article is to summarize the framework within which these studies were performed, and to present the key results and the general conclusions of the Task.Keywords
This publication has 8 references indexed in Scilit:
- Western Wind and Solar Integration Study: Hydropower Analysis2012
- Imbalance Costs of Wind Power for a Hydro Power Producer in FinlandWind Engineering, 2012
- IEA Wind Task 24 Integration of Wind and Hydropower Systems, Volume 1: Issues, Impacts, and Economics of Wind and Hydropower Integration2011
- Western Wind and Solar Integration Study2010
- Renewables Information 20082008
- On methodology for modelling wind power impact on power systemsInternational Journal of Global Energy Issues, 2008
- Impact of Large Scale Wind Power on System Adequacy in a Regional Power System with Weak Interconnections2007 IEEE Power Engineering Society General Meeting, 2007
- Separating and measuring the regulation and load-following ancillary servicesUtilities Policy, 1999