Abstract
Bidirectional electric vehicle (EV) charging enables stored energy to reduce peak loads for vehicle to buildings (V2Bs) and the vehicle to grid (V2G). However, building owners investing in V2B infrastructure while generating revenue from V2G services face challenges in planning and coordinating with EV owners due to uncertainties in their schedules and profit-sharing expectations. Additionally, misaligned building and grid peak times can create conflicts between V2B and V2G goals, which may negatively impact the building electricity bill. Unlike previous studies that used a contract-free approach for aggregating V2B and V2G, resulting in inconsistent participation, this article proposes a novel planning and contracting framework that enables building owner to determine the optimal contract parameters with EV owners. These parameters include minimum participation time in DR events, minimum arrival state of charge (SoC), and permitted emergency departure hours. The framework supports V2B aggregation with on-site distributed energy resources (DERs) for DR and V2G services, ensuring transparency and fairness through shared profits and performance-based penalties, while compensating building electricity bills due to V2G activities. The framework is composed of a tri-stage optimization process that uses Monte Carlo simulations to generate EV owner profit assessments, select optimal EV candidates based on charger availability, estimate contract parameters with profit/penalty sharing, and assign contracts between power system operators (PSOs), building owners, and EV owners under multiple virtual scenarios. Simulation results validate the contract parameter assessment and its performance via a 3-day case study with real-world datasets that demonstrates net revenue generation of ${\$}$ 209 for each EV owner and ${\$}$ 950 for building owners during DR events with a return on investment (ROI) of 134.5% and 130.7% for the EVs and Building owners, respectively.Keywords
Funding Information
- Independent Electricity System Operator (IESO) of Ontario, Canada, through a research agreement
This publication has 27 references indexed in Scilit:
- Coordinated expansion planning of coupled power and transportation networks considering dynamic network equilibriumApplied Energy, 2024
- Solar parking lot management: An IoT platform for smart charging EV fleets, using real-time data and production forecastsRenewable and Sustainable Energy Reviews, 2023
- Energy Smart Appliances2023
- A Techno-Social Approach to Unlocking Vehicle to Everything (V2X) Integration: A Real-World DemonstrationIEEE Access, 2023
- Optimal Planning of Parking Lots of PEVs Incorporating V2G for Reliability Improvement of Distribution SystemsIEEE Access, 2022
- Value‐stack aggregator optimal planning considering disparate DERs technologiesIET Generation, Transmission & Distribution, 2021
- Bidirectional smart charging of electric vehicles considering user preferences, peer to peer energy trade, and provision of grid ancillary servicesInternational Journal of Electrical Power & Energy Systems, 2021
- Distributed Optimal Vehicle-To-Grid Approaches With Consideration of Battery Degradation Cost Under Real-Time PricingIEEE Access, 2020
- Impact of EV charging strategies on peak demand reduction and load factor improvement2015
- Why the Monte Carlo method is so important todayWIREs Computational Statistics, 2014