Production planning of mines: Optimisation of block sequencing and destination
- 31 January 2012
- journal article
- research article
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 26 (2) , 93-103
Abstract
Mine planning is really about seeking an optimal solution to three coupled problems, namely: mine block sequencing, ore-waste discrimination by cut-off grades and determination of production rates. The key objective of the optimisation model is to maximise net present value (NPV) under the access and capacity constraints. In current practice, mine block sequencing is implemented for pre-defined cut-off grades and production rates determined outside of optimisation process (Model 1). This article takes a further step in improving the optimisation process by enabling ore-waste discrimination and block sequencing to be optimised concurrently through a mixed integer programming (MIP) model for given capacities (Model 2). This optimisation model gives rise to the problem of size in terms of the number of destinations. However, it allows more block configuration in tandem with increases in NPV. To demonstrate the superior attributes of this enhanced model, a case study was implemented using data from a gold mine. The new model generated 5% more NPV. Increasing computer capacity and CPU speed enables mine planners to use Model 2 for solving mine production planning problems efficiently.Keywords
This publication has 15 references indexed in Scilit:
- Robust stochastic mine production schedulingEngineering Optimization, 2010
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivityComputers & Operations Research, 2009
- Traditional and New MIP Models for Production Scheduling With In-Situ Grade VariabilityInternational Journal of Surface Mining, Reclamation and Environment, 2004
- Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal DepositsInternational Journal of Surface Mining, Reclamation and Environment, 2004
- A new—old algorithm for minimum‐cut and maximum‐flow in closure graphsNetworks, 2001
- The grade selection rule of the metal mines; an empirical study on copper minesResources Policy, 2000
- Optimization models for mine planningComputers & Industrial Engineering, 1999
- The Cut-off Grade and the Rationality of "The Rule of Thumb of Mines".Studies in Regional Science, 1998
- Optimal mine operating strategy for a fluctuating priceInternational Journal of Surface Mining, Reclamation and Environment, 1992
- Optimal mine production scheduling: evaluation of large scale mathematical programming approachesGeotechnical and Geological Engineering, 1983