Minimizing total flow time in a two-machine flowshop problem with minimum makespan
Authors:
- 13 February 2001
- journal article
- Published by Elsevier in International Journal of Production Economics
- Vol. 69 (3) , 323-338
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Genetic algorithms for the two-stage bicriteria flowshop problemEuropean Journal of Operational Research, 1996
- A combined branch-and-bound and genetic algorithm based approach for a flowshop scheduling problemAnnals of Operations Research, 1996
- A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling ProblemJournal of the Operational Research Society, 1995
- Multiple and bicriteria scheduling: A literature surveyEuropean Journal of Operational Research, 1995
- Deterministic scheduling in computing and manufacturing systems: a survey of models and algorithmsMathematics and Computers in Simulation, 1993
- Heuristic algorithm for scheduling in a flowshop to minimize total flowtimeInternational Journal of Production Economics, 1993
- Multiobjective flow-shop schedulingNaval Research Logistics (NRL), 1990
- Extreme solutions of the two machine flow‐shop problemNaval Research Logistics Quarterly, 1981
- Optimality Criteria for Flowshop SchedulesA I I E Transactions, 1971
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954