Scheduling research in multiple resource constrained job shops: a review and critique
Authors:
- 1 August 1996
- journal article
- review article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 34 (8) , 2077-2097
Abstract
No abstract availableThis publication has 54 references indexed in Scilit:
- Resource constraint measures in a dual constrained job shopOmega, 1994
- Which one is responsible for WIP: the workstations or the material handling system?International Journal of Production Research, 1992
- Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependencyInternational Journal of Production Research, 1992
- Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing systemInternational Journal of Production Research, 1992
- A Review of the Dual Resource Constrained System ResearchIIE Transactions, 1989
- THE TIMING OF LABOR TRANSFERS IN DUAL RESOURCE‐CONSTRAINED SYSTEMS: “PUSH” VS. “PULL” RULES*Decision Sciences, 1987
- The effects of input control in a simple scheduling modelJournal of Operations Management, 1984
- An empirical analysis of job shop dispatch rule selectionJournal of Operations Management, 1981
- Job shop scheduling—A case studyOmega, 1976
- A Review of Job Shop SchedulingJournal of the Operational Research Society, 1966