Project Management Maturity and Performance of Building Construction Projects in Myanmar
- 1 February 2023
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Practice Periodical on Structural Design and Construction
- Vol. 28 (1) , 04022070
Abstract
Maturity models are credited with raising project management awareness, but no conclusive evidence supports their use as a tool for performance enhancement in construction project settings. The present study thus examined the influence of time, cost, and quality management maturity on performance indices of building construction projects in Myanmar. The study further assessed how maturity in time, cost, and quality varied between public and private construction organizations. Four building construction projects, i.e., two operated by private construction organizations and two operated by public construction organizations in Myanmar, have been chosen for the data collection. The project manager and an individual from the upper management of each project were interviewed in three stages to obtain the maturity level. The performance indices of each project were evaluated quantitatively. The study’s findings revealed a positive relationship between project management maturity and project performance. Specifically, a higher time management maturity contributed to greater time performance, and elevated cost management maturity projected higher cost performance. Contrary to the expectations, the study could not find a significant relationship between quality management maturity and quality performance. The results further revealed that the average time management maturity of public construction organizations was significantly higher. Still, the average cost and quality management maturity were considerably lower than that of private construction organizations. The construction organizations aiming to enhance the project performance should focus on reaching a higher maturity in time and cost management knowledge areas.Keywords
This publication has 36 references indexed in Scilit:
- Demonstrating a linkage between construction industry maturity and performance: a case study of Guyana and New BrunswickCanadian Journal of Civil Engineering, 2012
- The effect of relationship management on project performance in constructionInternational Journal of Project Management, 2012
- Why Cost and Schedule Overruns on Mega Oil Sands Projects?Practice Periodical on Structural Design and Construction, 2010
- The Role of Project Management Maturity and Organizational Culture in Perceived PerformanceProject Management Journal, 2009
- Structuring the prediction model of project performance for international construction projects: A comparative analysisExpert Systems with Applications, 2009
- Building Value through Sustainable Project Management OfficesProject Management Journal, 2009
- Causes and effects of delays in Malaysian construction industryInternational Journal of Project Management, 2007
- Construction Delays in Hong Kong Civil Engineering ProjectsJournal of Construction Engineering and Management, 2006
- Project Management Process Maturity (PM)2 ModelJournal of Management in Engineering, 2002
- Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteriaInternational Journal of Project Management, 1999