An investigation of the relationship between muck geometry, TBM performance, and operational parameters: A case study in Golab II water transfer tunnel

Authors:
  • SHSasan Heydari
    Sasan Heydari
  • JHJafar Khademi Hamidi
    Jafar Khademi Hamidi
  • MMMasoud Monjezi
    Masoud Monjezi
  • AEAbbas Eftekhari
    Abbas Eftekhari

Abstract
No abstract available
Funding Information
  • Golab tunnel project

This publication has 41 references indexed in Scilit: