An investigation of the relationship between muck geometry, TBM performance, and operational parameters: A case study in Golab II water transfer tunnel
Authors:
- Sasan HeydariSHSasan Heydari
- Jafar Khademi HamidiJHJafar Khademi Hamidi
- Masoud MonjeziMMMasoud Monjezi
- Abbas EftekhariAEAbbas Eftekhari
- 1 June 2019
- journal article
- research article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 88, 73-86
Abstract
No abstract availableKeywords
Funding Information
- Golab tunnel project
This publication has 41 references indexed in Scilit:
- Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base TunnelTunnelling and Underground Space Technology, 2013
- A new hard rock TBM performance prediction model for project planningTunnelling and Underground Space Technology, 2011
- TBM Performance Analysis in Pyroclastic Rocks: A Case History of Karaj Water Conveyance TunnelRock Mechanics and Rock Engineering, 2009
- Correlation of rock cutting tests with field performance of a TBM in a highly fractured rock formation: A case study in Kozyatagi-Kadikoy metro tunnel, TurkeyTunnelling and Underground Space Technology, 2009
- Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, IranTunnelling and Underground Space Technology, 2008
- Exploration Ahead of a Tunnel Face by TSWD – Tunnel Seismic While DrillingGeomechanics and Tunnelling, 2008
- In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnelsTunnelling and Underground Space Technology, 2007
- Influence of Rock Mass Parameters on the Performance of a TBM in a Gneissic Formation (Varzo Tunnel)Rock Mechanics and Rock Engineering, 2004
- Use of TBM muck as construction materialTunnelling and Underground Space Technology, 2000
- A Scale of Grade and Class Terms for Clastic SedimentsThe Journal of Geology, 1922