Multi-variable selection of the main mine shaft location
- 1 November 2013
- journal article
- Published by Pleiades Publishing Ltd in Journal of Mining Science
- Vol. 49 (6) , 950-954
Abstract
Selecting the location of the main mine shaft is a demanding multi-criteria task. The solution does not depend only on identification of the potential location for the construction and the criteria conditions set for the selection, but also on the applied procedure in the analysis. Since there is no general scientific agreement on the selection of the most suitable quantitative method for the support to decision making for this type of analyses, the problem is becoming even more complex. In terms of the Velenje Mine shaft location, the authors describe the approach that can be an exit from this situation. The idea of an approach is not the selection of the most suitable decision making support method but a multi-model procedure where several multi-criteria methods are being used simultaneously. In case when the techniques do not yield the same order of alternatives, it is advised to generate the final order using the method of ponderation.Keywords
This publication has 4 references indexed in Scilit:
- A fuzzy method for selecting underground coal mining method considering mechanization criteriaJournal of Mining Science, 2012
- Multiattribute prediction of terrain stability above underground mining operations2011
- Transition from open-pit to underground as a new optimization challenge in mining engineeringJournal of Mining Science, 2009
- Extended VIKOR method in comparison with outranking methodsEuropean Journal of Operational Research, 2007