Techno-Economic Analysis of the Modernization Options of a Gas Turbine Power Plant Using Aspen HYSYS
Authors:
- Dias Raybekovich UmyshevDUDias Raybekovich Umyshev
- Eduard Vladislavovich OsipovEOEduard Vladislavovich Osipov
- Andrey Anatolievich KibarinAKAndrey Anatolievich Kibarin
- Maxim Sergeyevich KorobkovMKMaxim Sergeyevich Korobkov
- Tatyana Viktorovna KhodanovaTKTatyana Viktorovna Khodanova
- Zhansaya Serikkyzy DuisenbekZDZhansaya Serikkyzy Duisenbek
Open Access
Abstract
Currently, 90% of Kazakhstan’s oil is situated in 15 oil and gas fields where simple cycle gas turbines are utilized for electricity generation. The need for developing techniques to enhance the efficiency and eco-friendliness of fuel consumption in Kazakhstan’s oil fields is imperative. In this article, methods for improving the energy efficiency of a simple gas turbine power plant functioning in an oil field are discussed, with consideration given to the impact of ambient temperature and specific environmental constraints, such as water scarcity and high temperatures. Two schemes to increase efficiency are evaluated: the first involves the utilization of a waste heat boiler for steam production intended for technological purposes, while the second involves electricity generation through a combination of a waste heat boiler and a steam turbine. Models based on Aspen HYSYS were formulated, with actual gas turbine power plant operation taken into account. Analysis indicated that a waste heat boiler scheme could generate up to 350 t/h of steam, completely replacing power boilers. Im plementation of the combined cycle power plant (CCPP) system resulted in the production of up to 262.42 MW of electricity. Environmental analyses demonstrated that both schemes exhibit comparable specific emissions in terms of power generation, with 0.56 kgCO2/kWh for HRSG and 0.53 kgCO2/kWh for CCPP. Technological, environmental, and economic analyses were conducted to determine the most promising technology, considering the specifics of the oil fields in Kazakhstan. Based on the payback period for HRSG (4 years) and CCPP (7 years) options, it was deduced that the former is the most favorable for implementationKeywords
This publication has 28 references indexed in Scilit:
- Analysis of increasing efficiency of modern combined cycle power plant: A case studyEnergy, 2018
- Performance analysis of partially recuperative gas turbine combined cycle under off-design conditionsEnergy Conversion and Management, 2018
- Effect of the ambient conditions on gas turbine combined cycle power plants with post-combustion CO2 captureEnergy, 2017
- Review of organic Rankine cycle (ORC) architectures for waste heat recoveryRenewable and Sustainable Energy Reviews, 2015
- Energy and exergy analysis of intercooled combustion-turbine based combined cycle power plantEnergy, 2013
- Optimum design of dual pressure heat recovery steam generator using non-dimensional parameters based on thermodynamic and thermoeconomic approachesApplied Thermal Engineering, 2013
- A gas turbine model for studies on distributed generation penetration into distribution networks2011
- Enhancing the efficiency and power of the triple-pressure reheat combined cycle by means of gas reheat, gas recuperation, and reduction of the irreversibility in the heat recovery steam generatorApplied Energy, 2008
- Industrial Boilers and Heat Recovery Steam Generators2002
- Analytical solutions and typical characteristics of part-load performances of single shaft gas turbine and its cogenerationEnergy Conversion and Management, 2002