Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method
Authors:
- 1 January 1996
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 88 (2) , 336-344
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- The CON due-date determination method with processing time-dependent lateness penaltiesInternational Journal of Production Economics, 1995
- Optimal constant due-date determination and sequencing of n jobs on a single machineInternational Journal of Production Economics, 1991
- On the Multiple-machine Extension to a Common Due-date Assignment and Scheduling ProblemJournal of the Operational Research Society, 1991
- Sequencing with Earliness and Tardiness Penalties: A ReviewOperations Research, 1990
- A Heuristic for Common Due-date Assignment and Job Scheduling on Parallel MachinesJournal of the Operational Research Society, 1989
- Survey of scheduling research involving due date determination decisionsEuropean Journal of Operational Research, 1989
- On the Assignment of Optimal Due DatesJournal of the Operational Research Society, 1989
- Determination of an optimal common due date and optimal sequence in a single machine job shopInternational Journal of Production Research, 1988
- A DUALITY APPROACH TO OPTIMAL DUE-DATE DETERMINATIONEngineering Optimization, 1985
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single MachineJournal of the Operational Research Society, 1984