Design Methodology for Selection of Horizontal Openhole Sand-Control Completions Supported by Field Case Histories
Authors:
- 1 September 2003
- journal article
- Published by Society of Petroleum Engineers (SPE) in SPE Drilling & Completion
- Vol. 18 (03) , 235-255
Abstract
Summary: Reservoirs requiring sand control pose a major challenge for selecting a suitable completion method. Horizontal openhole completions have been successfully used in such reservoirs to eliminate sand production while maximizing productivity/injectivity and well deliverability throughout the expected life of the completion and minimizing risk and complexity. Although horizontal, openhole, sand-control completions, ranging from preperforated/slotted liners to gravel packs, have been applied widely in the last decade and many case histories have been discussed in the literature, a systematic methodology for selecting these completion methods remains to be documented. It is the objective of this paper to propose such a design methodology by unifying the broad experience and understanding from a global, technically integrated perspective. The paper first discusses a generalized and unified methodology for determining when to install sand control, what to install for sand control, and how to install it in horizontal openhole completions. Specific factors recognized as affecting "when" are in-situ stresses, pore-pressure decline (sand prediction), expected well life, production rate, hydrocarbon and well type, gross product value, sand tolerance capacity, environmental limitations, and intervention capabilities, while the integration of all these factors has an impact on the overall risk analysis. In addition to many of the previous factors, critical drivers affecting "what" are identified as wellbore architecture, reservoir lithology and petrophysical properties, and sandface equipment reliability. Additional parameters impacting "how" are reservoir drilling fluid, displacement and cleanup methodology, screen type, operational implementation/ assurance (risk management, operational timing, and location logistics), torque and drag analysis, and gravel-placement simulations. Secondly, examples of this methodology are presented in detailed case histories pertaining to different types of horizontal, openhole, sandface completions, including slotted liners, standalone screens (including expandable), and gravel packs, as well as various integrated cleanup methods, along with a summary of the lessons learned by each company.Keywords
This publication has 18 references indexed in Scilit:
- Design and Execution of a 3000-ft Horizontal Gravel-Packed Completion (A Kazakhstan Case History)2000
- Emerging Techniques in Gravel Packing Open-Hole Horizontal Completions in High-Performance Wells2000
- Filtercake Cleanup in Open-Hole Gravel-Packed Completions: A Necessity or a Myth?2000
- Near Wellbore Cleanup in Openhole Horizontal Sand Control Completions: Laboratory Experiments2000
- Building a knowledge-efficient sanding advisorKnowledge-Based Systems, 1999
- Laboratory Development of a Novel, Simultaneous Cake-Cleanup and Gravel-Packing System for Long, Highly-Deviated or Horizontal Open-Hole Completions1998
- A Global Perspective on Sand Control Treatments1998
- New Criteria for Gravel and Screen Selection for Sand Control1998
- Gravel Packing Horizontal Wellbores with Leak-Off Using Shunts1997
- Criteria for Back Production of Drilling Fluids through Sand Control Screens1997