Neuro-fuzzy approaches to short-term electrical load forecasting
- 1 January 2000
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 6, 229-234 vol.6
Abstract
We investigate the application of the Takagi-Sugeno fuzzy models to short-term electrical load forecasting problem. Several learning algorithms for these type fuzzy systems are discussed. For identification of the models with linear antecedents the combination of the cluster estimation and ordinary least squares method are applied. For nonlinear antecedent modelling purposes the fuzzy switched ensemble of feedforward neural networks was used. The performance of the models is compared for two-day ahead peak load prediction in the distribution network.Keywords
This publication has 5 references indexed in Scilit:
- Uncertainty of the short-term electrical load forecasting in utilities2000
- Automatic fuzzy model identification for short-term load forecastIEE Proceedings - Generation, Transmission and Distribution, 1999
- Fuzzy modeling for short term load forecasting using the orthogonal least squares methodIEEE Transactions on Power Systems, 1999
- NN-driven fuzzy reasoningInternational Journal of Approximate Reasoning, 1991
- PARALLEL SELF-ORGANIZING FEATURE MAPS FOR UNSUPERVISED PATTERN RECOGNITIONInternational Journal of General Systems, 1990