Hazard-based model for concrete pouring duration using construction site and supply chain parameters
- 1 November 2016
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 71, 283-293
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- Analysis, modeling and solution of the concrete delivery problemEuropean Journal of Operational Research, 2009
- Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucksAutomation in Construction, 2006
- Modeling the ready mixed concrete delivery system with neural networksAutomation in Construction, 2005
- Lognormal Distribution Provides an Optimum Representation of the Concrete Delivery and Placement ProcessJournal of Construction Engineering and Management, 2005
- Optimizing the schedule of dispatching RMC trucks through genetic algorithmsAutomation in Construction, 2004
- Coordinated scheduling of production and delivery from multiple plants and with time windows using genetic algorithms2004
- Estimating the productivity of cyclic construction operations using case-based reasoningAdvanced Engineering Informatics, 2004
- Estimating key characteristics of the concrete delivery and placement process using linear regression analysisCivil Engineering and Environmental Systems, 2003
- RISim: Resource-Interacted Simulation Modeling in ConstructionJournal of Construction Engineering and Management, 2002
- Confidence bands for a survival curve from censored dataBiometrika, 1980