Design issues for adaptive control charts
Authors:
- Willis A. JensenWJWillis A. Jensen
- Marion R. ReynoldsMRMarion R. Reynolds
- 22 April 2008
- journal article
- research article
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 24 (4) , 429-445
Abstract
Adaptive control charts allow the components of the quality‐monitoring scheme to vary in order to obtain improved performance over non‐adaptive control charts. Research has centered on components such as the sample size, time between samples, warning limits, and control limits and has recommended a variety of schemes, many of which are optimal in some sense. In practice, there are many other adaptive schemes that are near optimal, which will still yield considerable improvement over non‐adaptive control charts. In addition, the impact of parameter estimation on adaptive control chart performance must be taken into consideration. Based on the simulation results shown here, adaptive control charts should only be used for mature processes, where a sufficient amount of Phase I data have been obtained to ensure that the estimated control limits are accurate. When evaluating control chart performance, we consider initial state performance measures for simplicity and note that the conclusions obtained here apply to steady‐state performance measures. The evaluation of performance measures is easily handled by the Markov chain approach detailed in the Appendix. Copyright © 2008 John Wiley & Sons, Ltd.Keywords
This publication has 33 references indexed in Scilit:
- The Performance of Exponentially Weighted Moving Average Charts With Estimated ParametersTechnometrics, 2001
- Guidelines for the application of adaptive control charting schemesInternational Journal of Production Research, 2000
- On constructingT2control charts for on-line process monitoringIIE Transactions, 1999
- The run length distributions of theR, sands2control charts when σ is estimatedCanadian Journal of Statistics, 1998
- Evaluation of a three-state adaptive sample size X control chartInternational Journal of Production Research, 1998
- Evaluating properties of variable sampling interval control chartsSequential Analysis, 1995
- ADAPTIVE SAMPLING ENHANCEMENTS FOR SHEWHART CONTROL CHARTSIIE Transactions, 1993
- Optimal variable sampling interval control chartsSequential Analysis, 1989
- Optimal one-sided shewhart control charts with variable sampling intervalsSequential Analysis, 1989
- $\overline{X}$ Charts with Variable Sampling IntervalsTechnometrics, 1988