The Application of the Earned Value Management in the Last Planner System for Project Performance Control
Authors:
- 8 June 2013
- book chapter
- Published by Springer Nature
- p. 851-857
Abstract
No abstract availableKeywords
This publication has 4 references indexed in Scilit:
- Management Thinking in the Earned Value Method System and the Last Planner SystemJournal of Management in Engineering, 2010
- LEAPCON: Simulation of Lean Construction of High-Rise Apartment BuildingsJournal of Construction Engineering and Management, 2007
- Production System Loading–Cycle Time Relationship in Residential ConstructionJournal of Construction Engineering and Management, 2005
- Parade Game: Impact of Work Flow Variability on Trade PerformanceJournal of Construction Engineering and Management, 1999