Multi-tool job sequencing for tool-change reduction

Authors:

Abstract
Statistical analysis of machine utilization has shown that about 45% of machine time is spent in tool changes between jobs. Reducing job change-over costs can therefore make a big difference in machine utilization. Job change-over costs depend greatly on the job sequence chosen for a. given job collection, and this paper shows that systematic job sequencing can reduce machine setting time by as much as 80%. Apart from the direct benefit accruing from systematic job sequencing, there can be indirect benefits through a continuing programme of tool and tooling standardization. The method is available in both a manual version and a computerized version, and a demonstration is given.

This publication has 3 references indexed in Scilit: