Multi-tool job sequencing for tool-change reduction
Authors:
- 1 July 1981
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 19 (4) , 425-435
Abstract
Statistical analysis of machine utilization has shown that about 45% of machine time is spent in tool changes between jobs. Reducing job change-over costs can therefore make a big difference in machine utilization. Job change-over costs depend greatly on the job sequence chosen for a. given job collection, and this paper shows that systematic job sequencing can reduce machine setting time by as much as 80%. Apart from the direct benefit accruing from systematic job sequencing, there can be indirect benefits through a continuing programme of tool and tooling standardization. The method is available in both a manual version and a computerized version, and a demonstration is given.Keywords
This publication has 3 references indexed in Scilit:
- Some Methods of Producing Approximate Solutions to Travelling Salesman Problems with Hundreds or Thousands of CitiesJournal of the Operational Research Society, 1971
- An Algorithm for the Traveling Salesman ProblemOperations Research, 1963
- A Method for Solving Traveling-Salesman ProblemsOperations Research, 1958