Defining Cost/Schedule Performance Indices and Their Ranges for Design Projects
Author:
- 1 April 2001
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 17 (2) , 122-130
Abstract
Cost/schedule performance indices (C/SPIs) can indicate project performance, but they need to be operationally defined to be more adopted in practice. This paper defines C/SPIs and their values for design projects. From observing design operations, the C/SPIs were defined at project and milestone levels, and their characteristics were identified. The value ranges, representing different degrees of performance, were determined from related research and tested by real data. The results show that the values and scores derived from the defined ranges effectively differentiate performance, which means the C/SPIs and ranges are well defined. The two-level C/SPIs and value ranges can enhance the application of the earned value concept and evaluate design project performance more systematically and accurately.Keywords
This publication has 7 references indexed in Scilit:
- Development of Consultant Performance Measures for Design ProjectsProject Management Journal, 1998
- Implementing Earned Value Easily and EffectivelyProject Management Journal, 1998
- Systematizing Construction Project EvaluationsJournal of Management in Engineering, 1996
- Managing Design under Lump-Sum ContractJournal of Management in Engineering, 1995
- Improving Project Management of DesignJournal of Management in Engineering, 1994
- Management of Engineering/Design PhaseJournal of Construction Engineering and Management, 1991
- Systematic Data Collection1988