Simulation-based two-phase genetic algorithm for the capacitated re-entrant line scheduling problem
- 1 October 2009
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 57 (3) , 660-666
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- A hybrid genetic algorithm for the re-entrant flow-shop scheduling problemExpert Systems with Applications, 2008
- Relative Value Function Approximation for the Capacitated Re-Entrant Line Scheduling ProblemIEEE Transactions on Automation Science and Engineering, 2005
- Deadlock control methods in automated manufacturing systemsIEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans, 2004
- Genetic algorithm using sequence rule chain for multi-objective optimization in re-entrant micro-electronic production lineRobotics and Computer-Integrated Manufacturing, 2003
- A generalized stochastic petri net model for performance analysis and control of capacitated reentrant linesIEEE Transactions on Robotics and Automation, 2003
- Use of genetic algorithms to solve production and operations management problems: A reviewInternational Journal of Production Research, 2003
- Queueing network models in the design and analysis of semiconductor wafer fabsIEEE Transactions on Robotics and Automation, 2001
- Fluctuation smoothing policies are stable for stochastic re-entrant linesDiscrete Event Dynamic Systems, 1996
- A tutorial survey of job-shop scheduling problems using genetic algorithms—I. representationComputers & Industrial Engineering, 1996
- Scheduling semiconductor manufacturing plantsIEEE Control Systems, 1994