Reclamation pathway of waste piles: A case study in Shanghai
Authors:
- Jifei CuiJCJifei Cui
- Jingpei LiJLJingpei Li
- Jianzhuang XiaoJXJianzhuang Xiao
- Jianping YaoJYJianping Yao
- Zhenkun YangZYZhenkun Yang
- 1 April 2020
- journal article
- research article
- Published by Elsevier in Journal of Cleaner Production
- Vol. 253
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (41972274, 51908466)
This publication has 31 references indexed in Scilit:
- Time-dependent uplift capacity of driven piles in low to medium density chalkGéotechnique Letters, 2017
- A closed-loop life cycle assessment of recycled aggregate concrete utilization in ChinaWaste Management, 2016
- Estimation of building-related construction and demolition waste in ShanghaiWaste Management, 2014
- Recycled aggregate from C&D waste & its use in concrete – A breakthrough towards sustainability in construction sector: A reviewConstruction and Building Materials, 2014
- Shaft Resistance and Setup Factors for Piles Jacked in ClayJournal of Geotechnical and Geoenvironmental Engineering, 2014
- Chloride threshold level for corrosion of steel in concreteCorrosion Science, 2007
- A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of MalaysiaResources, Conservation and Recycling, 2006
- Side Shear Setup. II: Results From Florida Test PilesJournal of Geotechnical and Geoenvironmental Engineering, 2005
- Side Shear Setup. I: Test Piles Driven in FloridaJournal of Geotechnical and Geoenvironmental Engineering, 2005
- Evaluating sustainability in waste management: the case of construction and demolition, chemical and clinical wastes in Hong KongResources, Conservation and Recycling, 2003