An Evaluation of Tour Scheduling Heuristics with Differences in Employee Productivity and Cost
Authors:
- 1 September 1991
- journal article
- Published by Wiley in Decision Sciences
- Vol. 22 (4) , 700-718
Abstract
This study focuses on the manpower tour scheduling problem using data from a lockbox system of a commercial bank. The lockbox system uses employees who differ in productivity, hourly cost, number of available working hours per week, and days‐off constraints. These specific problem characteristics require a more general problem formulation and solution procedure for the manpower tour scheduling problem than addressed in previous research. Four heuristic methods for solving the problem (three developed here and a simple round‐up procedure) are tested on a set of forty problems. The results of this study show the effort to develop sophisticated heuristic methods for this class of problems is well justified.Keywords
This publication has 10 references indexed in Scilit:
- An Evaluation of a Full‐/Part‐time Tour Scheduling MethodologyInternational Journal of Operations & Production Management, 1988
- Simple Approaches to Shift, Days-Off and Tour Scheduling ProblemsManagement Science, 1983
- A Simulation Analysis of Tour-Shift Construction ProceduresManagement Science, 1982
- A Guaranteed-Accuracy Round-off Algorithm for Cyclic Scheduling and Set CoveringOperations Research, 1981
- Cyclic Scheduling via Integer Programs with Circular OnesOperations Research, 1980
- A Case Study of Encoder Shift Scheduling under UncertaintyManagement Science, 1979
- Polynomial Complete Consecutive Information Retrieval ProblemsSIAM Journal on Computing, 1977
- Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental AnalysisManagement Science, 1976
- Workforce Allocation in Cyclical Scheduling Problems: A SurveyJournal of the Operational Research Society, 1976
- Letter to the Editor—A Comment on Edie's “Traffic Delays at Toll Booths”Journal of the Operations Research Society of America, 1954