Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
Authors:
- 19 November 2010
- journal article
- research article
- Published by Taylor & Francis in Mathematical and Computer Modelling of Dynamical Systems
- Vol. 16 (4) , 373-388
Abstract
The classic economic production quantity (EPQ) model assumes a continuous inventory-issuing policy for satisfying product demand and a perfect production for all items produced. However, in a real-life vendor–buyer integrated system, a multi-delivery policy is often used in lieu of continuous issuing policy and it is inevitable to generate defective items during a production run. This study addresses these issues by incorporating multiple deliveries of the finished batch, customer's inventory-holding cost and manufacturer's quality assurance cost into an EPQ model with the imperfect reworking of random defective items. Mathematical modelling and analyses are employed. Convexity of the long-run expected cost function is proved by the use of Hessian matrix equations, and the closed-form solutions in terms of the optimal lot size and optimal number of deliveries are obtained. The research results are demonstrated with a numerical example with a discussion on its practical usage.Keywords
This publication has 27 references indexed in Scilit:
- An optimization problem of manufacturing systems with stochastic machine breakdown and rework processApplied Stochastic Models in Business and Industry, 2007
- Optimal manufacturing batch size with rework process at a single-stage production systemComputers & Industrial Engineering, 2004
- Optimizing inventory decisions in a multi-stage multi-customer supply chainTransportation Research Part E: Logistics and Transportation Review, 2003
- An optimal batch size for a production system operating under periodic delivery policyComputers & Industrial Engineering, 1999
- Minimal repair policies for an economic manufacturing processJournal of Quality in Maintenance Engineering, 1998
- Optimizing a Production System with a Fixed Delivery ScheduleJournal of the Operational Research Society, 1996
- Backtracking and its Amoebic Properties in One-dimensional Machine Location ProblemsJournal of the Operational Research Society, 1994
- Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and ReworkJournal of the Operational Research Society, 1994
- Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approachInternational Journal of Production Research, 1987
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986