Coordination policy for production and delivery scheduling in the closed loop supply chain
- 11 June 2018
- journal article
- research article
- Published by Springer Nature in Production Engineering
- Vol. 12 (5) , 621-631
Abstract
No abstract availableKeywords
This publication has 23 references indexed in Scilit:
- A time-varying lot sizes approach for the economic lot scheduling problem with returnsInternational Journal of Production Research, 2015
- Economic lot and delivery scheduling problem for multi-stage supply chainsInternational Journal of Production Economics, 2011
- A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle caseEuropean Journal of Operational Research, 2006
- Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer systemInternational Journal of Production Economics, 2006
- A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chainsEuropean Journal of Operational Research, 2006
- A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods deliveringOmega, 2005
- An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problemEuropean Journal of Operational Research, 2004
- Synchronization in supply chains: implications for design and managementJournal of the Operational Research Society, 2003
- A genetic algorithm for solving economic lot size scheduling problemComputers & Industrial Engineering, 2002
- The economic lot and delivery scheduling problem: models for nested schedulesIIE Transactions, 1995