A game-theory approach for job scheduling in networked manufacturing
Authors:
- 3 June 2008
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 41 (9-10) , 972-985
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- e2-MES: an e-service-driven networked manufacturing platform for extended enterprisesInternational Journal of Computer Integrated Manufacturing, 2007
- GA based heuristic for the open job shop scheduling problemThe International Journal of Advanced Manufacturing Technology, 2006
- Generating a task-driven extended enterprise for e-manufacturingInternational Journal of Internet and Enterprise Management, 2005
- An efficient genetic algorithm for job shop scheduling with tardiness objectivesEuropean Journal of Operational Research, 2004
- A branch-and-bound algorithm for the hybrid flowshopInternational Journal of Production Economics, 2000
- A hierarchic approach to production planning and scheduling of a flexible manufacturing systemRobotics and Computer-Integrated Manufacturing, 1999
- An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedateComputers & Industrial Engineering, 1999
- A distributed architecture and negotiation protocol for scheduling in manufacturing systemsComputers in Industry, 1999
- Holonic manufacturing scheduling: architecture, cooperation mechanism, and implementationComputers in Industry, 1998
- Petri net modeling and scheduling for cyclic job shops with blockingComputers & Industrial Engineering, 1998