An extended model for remaining time prediction in manufacturing systems using process mining
Authors:
- Alexandre Checoli ChoueiriACAlexandre Checoli Choueiri
- Denise Maria Vecino SatoDSDenise Maria Vecino Sato
- Edson Emilio ScalabrinESEdson Emilio Scalabrin
- Eduardo Alves Portela SantosESEduardo Alves Portela Santos
- 1 July 2020
- journal article
- research article
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 56, 188-201
Abstract
No abstract availableKeywords
Funding Information
- Coordenação de Aperfeiçoamento de Pessoal de Nível Superior
This publication has 31 references indexed in Scilit:
- A hybrid algorithm based on fuzzy linear regression analysis by quadratic programming for time estimation: An experimental study in manufacturing industryJournal of Manufacturing Systems, 2015
- Service Innovation and Smart Analytics for Industry 4.0 and Big Data EnvironmentProcedia CIRP, 2014
- Time prediction based on process miningInformation Systems, 2011
- Transition of interarrival time patterns between automated and manual configurations of assembly systemsJournal of Manufacturing Systems, 2007
- Factory Cycle-Time Prediction With a Data-Mining ApproachIEEE Transactions on Semiconductor Manufacturing, 2006
- Neural-Network-Based Delivery Time Estimates for Prioritized 300-mm Automatic Material Handling OperationsIEEE Transactions on Semiconductor Manufacturing, 2004
- A Bayesian model of cycle time predictionIIE Transactions, 2001
- Cycle time estimation for printed circuit board assembliesIEEE Transactions on Electronics Packaging Manufacturing, 2001
- Cycle-time improvements for photolithography process in semiconductor manufacturingIEEE Transactions on Semiconductor Manufacturing, 2001
- A tutorial on hidden Markov models and selected applications in speech recognitionProceedings of the IEEE, 1989