Infill Drilling in a Steamflood Operation: Kern River Field
Authors:
- 1 May 1987
- journal article
- Published by Society of Petroleum Engineers (SPE) in SPE Reservoir Engineering
- Vol. 2 (02) , 243-248
Abstract
Summary: An infill well program involving 574 wells in previously steamflooded idle reservoirs proved to be economical and increased recovery in some areas from 50 to 58%. These wells were recompleted to zones under active steam drive and showed similar recovery increases in addition to acceleration of reserves. These increases in recovery were attained without additional fuel.Keywords
This publication has 10 references indexed in Scilit:
- Guidelines for Converting Steamflood to WaterfloodSPE Reservoir Engineering, 1987
- Conversion of Mature Steamfloods to Low-Quality Steam and/or Hot-Water Injection Projects1985
- Infill Drilling To Increase Reserves—Actual Experience in Nine Fields in Texas, Oklahoma, and IllinoisJournal of Petroleum Technology, 1983
- San Ardo—A Case History of a Successful Steamflood1983
- Effect of Preheating on Kern River Field Steam DriveJournal of Petroleum Technology, 1983
- The Laboratory Development and Field Testing of Steam/Noncondensible Gas Foams for Mobility Control in Heavy Oil Recovery1982
- Steamflood Performance in the Kern River Field1980
- The Ten-Pattern Steamflood, Kern River Field, CaliforniaJournal of Petroleum Technology, 1975
- Performance of Steam Displacement in the Kern River FieldJournal of Petroleum Technology, 1975
- Conversion of Steam Injection to Waterflood, East Coalinga FieldJournal of Petroleum Technology, 1974