Group technology approach to the open shop scheduling problem with batch setup times
Author:
- V.A. StrusevichVSV.A. Strusevich
- 1 May 2000
- journal article
- research article
- Published by Elsevier in Operations Research Letters
- Vol. 26 (4) , 181-192
Abstract
No abstract availableKeywords
This publication has 7 references indexed in Scilit:
- Approximation algorithms for two-machine flow shop scheduling with batch setup timesMathematical Programming, 1998
- Two machine open shop scheduling problem with setup, processing and removal times separatedComputers & Operations Research, 1993
- Two-machine shop scheduling problems with batch processingMathematical and Computer Modelling, 1993
- Chapter 9 Sequencing and scheduling: Algorithms and complexity1993
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979
- Open Shop Scheduling to Minimize Finish TimeJournal of the ACM, 1976
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954