A two‐stage stochastic integer programming model for a thermal power system expansion
- 5 May 2004
- journal article
- Published by Wiley in International Transactions in Operational Research
- Vol. 11 (3) , 243-257
Abstract
In this paper the obtaining of an optimum policy in the capacity expansion planning of a particular thermal‐electric power system is proposed. Therefore, a two‐stage stochastic integer programming is formulated. The model includes, through a finite group of scenarios, the existent uncertainty related to the future availability of the thermal plants currently under operation. The resultant model is solved numerically by the application of the L‐shaped method, whose implementation and development were executed using the software AMPL, with CPLEX as a solver. The results reached are shown, which validate the use of the methodology adopted in this work.Keywords
This publication has 32 references indexed in Scilit:
- A scenario-based stochastic programming approach for technology and capacity planningComputers & Operations Research, 2002
- D-optimal designs for sensor and actuator locationsComputers & Operations Research, 2002
- Tool capacity planning for semiconductor fabrication facilities under demand uncertaintyEuropean Journal of Operational Research, 2000
- Electric capacity expansion under uncertain demand: decomposition approachesIEEE Transactions on Power Systems, 1998
- Models for planning capacity expansion of convenience stores under uncertain demand and the value of informationAnnals of Operations Research, 1995
- Robust Optimization for Power Systems Capacity Expansion under UncertaintyJournal of the Operational Research Society, 1994
- The integer L-shaped method for stochastic integer programs with complete recourseOperations Research Letters, 1993
- A multicut algorithm for two-stage stochastic linear programsEuropean Journal of Operational Research, 1988
- Electric Utility Capacity Expansion Planning with Uncertain Load ForecastsIIE Transactions, 1982
- Dynamic-programming approach to the selection and timing of generation-plant additionsProceedings of the Institution of Electrical Engineers, 1966