Construction Contract Administration Performance Assessment Tool by Using a Fuzzy Structural Equation Model
Open Access
- 10 January 2020
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 12 (2) , 523
Abstract
The contract administration process is inevitably complex, and improper performance of the associated tasks and procedures may lead to disputes between the contracting parties whilst further driving against the sustainability bottom lines. Therefore, this paper proposes an assessment tool to improve the implementation of construction contract administration (CCA) through a multi-dimensional construction contract administration performance model (CAPM), construction contract administration performance index (CCAPI), and a mobile software to assess the CCA performance at the project level by integrating the crisp value of the fuzzy set theory within a second-order confirmatory factor analysis of the structural equation modeling technique. A hybrid mobile application (CAPM) is developed using the Ionic framework which can run either in full model mode or short model mode with 93 and 33 key construction administration factors, respectively. Assessment of sustainability practices in the area of contract administration is a part of the holistic model and CAPM defines 13 major key indicators relevant to social and environmental sustainability while economic sustainability is scattered over the rest of the CAPM indicators. The CAPM is practically implemented in 13 international construction projects and the results reveal that the proposed tool is reasonably captured in the different performance levels of CCA, and we conclude a low level of implementing in risk management. As part of the holistic model, assessment of sustainability practices in the area of contract administration is separately discussed and the study reveals the need to improve the environmental and social sustainability practices in contract administration.Keywords
This publication has 25 references indexed in Scilit:
- Determinants and constraints to effective procurement contract management in Uganda: a practitioner's perspectiveInternational Journal of Logistics Systems and Management, 2014
- Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM MethodModern Applied Science, 2013
- Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction ProjectsJournal of Construction Engineering and Management, 2013
- Beyond Design: The Importance of Construction and Post-Construction Phases in Green DevelopmentsSustainability, 2010
- Establishing Construction Contract Administration Education/Training Program for Developing CountriesJournal of Construction Management, JSCE, 2008
- Determinants for effective performance of external project management consultants in MalaysiaEngineering, Construction and Architectural Management, 2007
- Performance Measurement in ConstructionJournal of Management in Engineering, 2004
- Developing and validating a multidimensional consumer-based brand equity scaleJournal of Business Research, 2001
- A new method for tool steel materials selection under fuzzy environmentFuzzy Sets and Systems, 1997
- The use of lisrel in validating marketing constructsInternational Journal of Research in Marketing, 1991