Process and quality control with a video camera, for a floor-tilling robot
Author:
- R. NavonRNR. Navon
- 30 November 2000
- journal article
- Published by Elsevier in Automation in Construction
- Vol. 10 (1) , 113-125
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- A description approach of information in a robotics-vision system2002
- Three-level broad-edge matching based real-time robot vision2002
- On-site labour-input data collection for comparison between housing-construction methodsInternational Journal of Project Management, 1997
- An Outdoor Stereo Vision Brick Recognition System for Construction Robots1996
- Conceptual design of a flooring robot: development methodology and resultsAutomation in Construction, 1995
- Automatic camera placement for robot vision tasks1995
- CAD-based intelligent robot vision system1995
- Identifying Key Features in a Building Using a Single Uncalibrated Camera1994
- The Development and Practice Test of the "Mark II" Mobile Robot for Concrete Floor Slab FinishingProceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc), 1988
- Application of Robotics to Building ConstructionProceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc), 1984