Practical Analysis of BIM Tasks for Modular Construction Projects in South Korea
Open Access
- 25 August 2020
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 12 (17) , 6900
Abstract
Building information modeling (BIM) and modular construction are important technologies for construction industry sustainability. This study proposes a relational matrix of key activities and BIM tasks of modular construction projects to analyze practical BIM tasks in Korea. To achieve this objective, 11 key activities and eight BIM tasks are identified through a comprehensive literature review and expert interviews. Then, the relational matrix of key activities and BIM tasks is proposed, and the BIM tasks in the matrix are analyzed in terms of necessity and efficiency using 5-point Likert scales. Finally, the matrix with the BIM utilization index is suggested. As a result, the average BIM utilization index is 0.80 in the off-site phase, and the index results show that 3D shop drawings have the highest index. In the on-site phase, the average BIM UI is 0.73 and the integration of a 4D model with quantity take-off is the most efficient at 0.85. Additionally, from the decision-maker’s perspective, the priority through the index presented helps in making decisions and in practical BIM execution planning. The proposed matrix is a practical reference for decision-makers considering the application of BIM in modular projects, and it contributes to a sustainable construction industry.Keywords
Funding Information
- Ministry of Land, Infrastructure and Transport (20RERP–B082884-07)
This publication has 18 references indexed in Scilit:
- Building information modelling for off-site construction: Review and future directionsAutomation in Construction, 2019
- BIM in off-site manufacturing for buildingsJournal of Building Engineering, 2017
- BIM-Based 4D Simulation to Improve Module Manufacturing Productivity for Sustainable Building ProjectsSustainability, 2017
- A mixed review of the adoption of Building Information Modelling (BIM) for sustainabilityJournal of Cleaner Production, 2017
- Utilization of 3D Visualization of Mobile Crane Operations for Modular Construction On-Site AssemblyJournal of Management in Engineering, 2015
- BIM based Optimize Method of Finish Material Placing for Modular UnitJournal of the Architectural Institute of Korea Structure & Construction, 2014
- A Design and Development of a Temporary Housing System Based on BIM in Advance of DisastersJournal of the Korean Housing Association, 2013
- A Study on Development of BIM Library for Unit Modular Housing - Focused on Small-sized Urban-life-housing -Journal of the Korean Housing Association, 2012
- BIM Standard in Off-Site ConstructionJournal of Architectural Engineering, 2012
- Automated post-simulation visualization of modular building production assembly lineAutomation in Construction, 2012