Markovian geology prediction approach and its application in mountain tunnels
Authors:
- Zhenchang GuanZGZhenchang Guan
- Tao DengTDTao Deng
- Saizhao DuSDSaizhao Du
- Bo LiBLBo Li
- Yujing JiangYJYujing Jiang
- 1 September 2012
- journal article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 31, 61-67
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- Probabilistic prediction of tunnel geology using a Hybrid Neural-HMMEngineering Applications of Artificial Intelligence, 2011
- Microtunneling decision support system (MDS) using Neural-Autoregressive Hidden Markov ModelExpert Systems with Applications, 2011
- Applying radial basis function neural networks to estimate next-cycle production rates in tunnelling constructionTunnelling and Underground Space Technology, 2010
- Expectation of boulder frequency when tunneling in glacial till: A statistical approach based on transition probabilityEngineering Geology, 2009
- Prediction of geological hazardous zones in front of a tunnel face using TSP-203 and artificial neural networksTunnelling and Underground Space Technology, 2008
- Transitional Markov Chain Monte Carlo Method for Bayesian Model Updating, Model Class Selection, and Model AveragingJournal of Engineering Mechanics, 2007
- Predicting ground conditions ahead of the tunnel face by vector orientation analysisTunnelling and Underground Space Technology, 2005
- Updating the Decision Aids for TunnelingJournal of Construction Engineering and Management, 2002
- Dynamic Probabilistic Decision ProcessesJournal of Construction Engineering and Management, 1989
- Geologic Prediction Model for TunnelingJournal of Construction Engineering and Management, 1987