An Artificial Immune Algorithm for the project scheduling problem under resource constraints
Authors:
- 1 March 2011
- journal article
- research article
- Published by Elsevier in Applied Soft Computing
- Vol. 11 (2) , 1975-1982
Abstract
No abstract availableKeywords
This publication has 29 references indexed in Scilit:
- Using an enhanced scatter search algorithm for a resource-constrained project scheduling problemSoft Computing, 2008
- A hybrid scatter search/electromagnetism meta-heuristic for project schedulingEuropean Journal of Operational Research, 2006
- Erratum to “Particle swarm optimization-based schemes for resource-constrained project scheduling” [Automation in Construction 14/3 (2005) 393–404]Automation in Construction, 2006
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode versionEuropean Journal of Operational Research, 2003
- A self‐adapting genetic algorithm for project scheduling under resource constraintsNaval Research Logistics (NRL), 2002
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2000
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical FormulationManagement Science, 1998
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling ProblemManagement Science, 1992
- Scheduling subject to resource constraints: classification and complexityDiscrete Applied Mathematics, 1983
- Advances in Critical Path MethodsJournal of the Operational Research Society, 1966