Modeling of multi-server repair problem with switching failure and reboot delay and related profit analysis
Authors:
- Ying-Lin HsuYHYing-Lin Hsu
- Jau-Chuan KeJKJau-Chuan Ke
- Tzu-Hsin LiuTLTzu-Hsin Liu
- Chia Huang WuCWChia Huang Wu
- 1 March 2014
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 69, 21-28
Abstract
No abstract availableThis publication has 24 references indexed in Scilit:
- Multi-server machine repair model with standbys and synchronous multiple vacationComputers & Industrial Engineering, 2012
- Standby system with general repair, reboot delay, switching failure and unreliable repair facility—A statistical standpointMathematics and Computers in Simulation, 2011
- Bootstrapping Computation of Availability for a Repairable System with Standby Subject to Imperfect SwitchingCommunications in Statistics - Simulation and Computation, 2011
- Bayesian assessing for a repairable system with standby imperfect switching and reboot delayInternational Journal of Systems Science, 2009
- Reliability‐based measure for a system with standbys subjected to switching failuresEngineering Computations, 2008
- A survey of the machine interference problemEuropean Journal of Operational Research, 2007
- Profit analysis of the M/M/R machine repair problem with balking, reneging, and standby switching failuresComputers & Operations Research, 2007
- VACATION POLICIES FOR MACHINE INTERFERENCE PROBLEM WITH AN UN-RELIABLE SERVER AND STATE-DEPENDENT SERVICE RATEJournal of the Chinese Institute of Industrial Engineers, 2006
- Cost analysis of the M/M/R machine repair problem with balking, reneging, and server breakdownsJournal of the Operational Research Society, 1999
- Machine interference problem with warm spares, server vacations and exhaustive servicePerformance Evaluation, 1997