Numerical Study on Soft Coal Pillar Stability in an Island Longwall Panel
Open Access
- 30 January 2021
- journal article
- research article
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Abstract
Roadway support and management of longwall panels in an island soft coal panel are always difficult work. In a test mine, stress distribution, deformation characteristic, and plastic zone distribution around the roadway and coal pillars in the development and mining periods were investigated with respect to the widths of different coal pillars using theoretical and simulation methods. The most reasonable width of coal pillars was comprehensively determined, and the field test was conducted successfully. The results show that a reasonable width of coal pillars is 7.0–8.2 m using the analytical method. The distribution of vertical stress in the coal pillars showed an asymmetric “double‐hump” shape, in which the range of abutment pressure was about 26.0–43.0 m, and the roadway should be laid away from stress concentration. When the coal pillar width is 5.0–7.0 m, deformation of the roadway is half that with 8.0–10.0 m coal pillar in the development and mining period. The plastic zone in the surrounding rock firstly decreases and increases with increasing coal pillar width; the smallest range occurs with a coal pillar width of 5.0 m. Finally, a reasonable width for coal pillars in an island panel was determined to be 5.0 m. Industrial practice indicated that a coal pillar width of 5.0 m efficiently controlled deformation of the surrounding rock, which was an important basis for choosing the width of coal pillars around gob‐side entries in island longwall panels with similar geological conditions.Keywords
Funding Information
- National Natural Science Foundation of China (52074239, 51927807)
This publication has 16 references indexed in Scilit:
- An innovative approach to theoretical analysis of partitioned width & stability of strip pillar in strip miningInternational Journal of Rock Mechanics and Mining Sciences, 2020
- Squeezing failure behavior of roof‐coal masses in a gob‐side entry driven under unstable overlying strataEnergy Science & Engineering, 2020
- Ground Response of a Gob-side Entry in a Longwall Panel Extracting 17 m-Thick Coal Seam: A Case StudyRock Mechanics and Rock Engineering, 2019
- Numerical Study of Failure Mechanisms and Control Techniques for a Gob-Side Yield Pillar in the Sijiazhuang Coal Mine, ChinaRock Mechanics and Rock Engineering, 2018
- An Innovative Approach for Gob-Side Entry Retaining With Thick and Hard Roof: A Case StudyTehnicki vjesnik - Technical Gazette, 2018
- Key Parameters of Gob-Side Entry Retaining in A Gassy and Thin Coal Seam with Hard RoofProcesses, 2018
- Analysis of Gateroad Stability in Relation to Yield Pillar Size: A Case StudyRock Mechanics and Rock Engineering, 2017
- Numerical Modeling for Yield Pillar Design: A Case StudyRock Mechanics and Rock Engineering, 2014
- An innovative approach for gateroad layout in highly gassy longwall top coal cavingInternational Journal of Rock Mechanics and Mining Sciences, 2013
- Coal pillar load calculation by pressure arch theory and near field extraction ratioInternational Journal of Rock Mechanics and Mining Sciences, 2010