Successful Development Drilling of an HP/HT Infill Well in a Highly Depleted Reservoir: Case Study

Authors:

Abstract
Drilling infill wells on HP/HT fields after a significant depletion has occurred represents a real challenge. It requires drilling from a cap rock remaining at or close to virgin pressure into a reservoir in which pore and fracture pressures have largely decreased due to production. No mud-weight-window exists anymore at the transition between cap rock and reservoir. The difficulty is further increased by uncertainties in the pressure profile along the well path, the rock mechanics and their change generated by the high and rapid depletion, and also by depth uncertainty on the top reservoir. For this reason, most HP/HT fields are developed by drilling all wells before a pre-defined limit of depletion level is reached at which the mud-weight-window closes. This limit is usually low. However, HP/HT producer wells face depletion related threats to their integrity: sand production and / or deformation of the production liner under rock movement. When these threats become effective, the well and its associated production will be lost. Replacement wells will need to be drilled. Additional wells are also needed to increase reserves by creating new off-take points. This paper describes the preparation work performed before drilling an HP/HT infill well in the highly depleted Franklin reservoir in the UKCS, the management of uncertainties during the drilling and some of the lessons learned from this first experience. Among them is the important influence of the reservoir depletion on the mechanics of the formations above reservoir. The success of this first HP/HT infill well after significant depletion proves the feasibility of drilling such wells. It opens the door to new opportunities in HP/HT developments.